Rafter Fest - Sunday the 9th of March 2008 / Preparing for the installation push
| 2008-03-09 09:52 |
|
Image 1 of 6 |
This picture shows the slider mounts installed on the top log of the side wall, ready for the rafters. We installed about thirty of these, including countersinking the holes with a chisel, on the day previous to the rafter-fest. This was taken on Sunday morning, after the installation of the temporary flooring (also visible).