Log House #2 (Pan Abode) Build Progress

Three typhoons and still counting... Lots of lost time due to bad weather, but we're actually fairly lucky compared to other parts of the country. Typhoon #12 was the most destructive in decades, with huge amounts of damage and loss of life. We can't really complain too much about a wet, warped floor.

[Image set 1] [Image set 2] [Image set 3] [Image set 4] [All in one]


Collage

Floor-Plan

North and West Elevations
 

South and East Elevations

Reasonable starting weather

...and then some rain
 

the rain stops for a while...

...and then starts again

the rain stops again, for a very short while...
 

...but starts again for a longer while

The weather clears...

...and, unusually, stays relatively clear
 

Another good day

A wet start, but the weather clears

September 15, 2011
 

September 21, 2011

September 24, 2011

September 28, 2011
 

October 3, 2011

October 7, 2011

October 7, 2011
 

October 11, 2011

October 12, 2011

October 12, 2011
 

October 16, 2011

October 16, 2011

November 25, 2011
 

October 19, 2011

October 19, 2011

October 21, 2011
 

October 22, 2011

October 23, 2011

October 30, 2011
 

October 31, 2011

November 2, 2011

November 4, 2011
 

November 4, 2011

November 5, 2011

November 5, 2011
 

November 15, 2011

November 25, 2011

November 25, 2011
 

November 25, 2011

December 11, 2011

December 12, 2011
 

December 16, 2011

December 19, 2011

December 28, 2011
 

December 30, 2011

January 3, 2012

January 8, 2012
 

January 6, 2012

January 13, 2012

January 10, 2012
 

January 10, 2012

January 24, 2012

The roof has frost, but nothing else...
 

Warm weather, so some more external work

...back into the interior for ceilings

...end wall panelling
 

...and stud wall panelling

Oak flooring going down

Oak flooring going down
 

Balusters, chimney, wall panelling

The kitchen unit is in

That annoying open top
 

The scaffolding is down

A spring run with the C.A.R.

View to the west, across the valley
 

Trench digging for plasic conduit

View to the west, early A.M.

View to the west, sunset
 

View of the house taken from the NW, looking SE

View of the house taken from the SW, looking NE

Deck railings, but...
 

Hot air vent installation

It must be summer

Solar Hot Water Panels - Rails, but no panels
 

Panel #1 in place...

Panel #2 in place...

Panel #3 in place...
 

Panel #4 in place...

All panels in place and pipes attached

The original (cottage) dual and new house quad
 

Sunjunior external hot-water tank unit

Baluster I

Baluster II
 

Baluster III

Both houses from the apple field (Photo: Gavin Brock)

The wood stove in-situ (Woodstock Soapstone "Fireview")
 

NewHouse collage

360-Degree View (Exterior)

360-Degree View (Exterior)
 

360-Degree View (Interior)

180-Degree View to west (Photo/Stitching: Gavin Brock)
[Image set 1] [Image set 2] [Image set 3] [Image set 4] [All in one]

This page created on 2012-11-24.