Log House #2 (Pan Abode) Build Progress

2011-10-12 15:49

[previous]

 

[index]

 

[next]

Image 24 of 95
[reduced]
(71k)
    [original]
(706k)

The dormer stud walls have been skinned and the centre stud wall extended out to the front of the dormer (at the rear of the house as we look at it here).