Log House #2 (Pan Abode) Build Progress

2011-10-12 08:25

[previous]

 

[index]

 

[next]

Image 23 of 95
[reduced]
(66k)
    [original]
(682k)

Looking down from the east end of the centre beam, it's easy to see the pockets in the top of the dormer stud walls where the smaller, roof support beams will fit. These will be lifted in manually, as they're much smaller than the main beams.