Log House #2 (Pan Abode) Build Progress

2011-10-11 10:23

[previous]

 

[index]

 

[next]

Image 22 of 95
[reduced]
(63k)
    [original]
(666k)

The framing for the front of the dormer was raised into place at the same time as the gable-ends, but the framing for the stud walls for the sides had to wait until the centre beam (top L/H side) and the two big angle beams had been secured in place.