Log House #2 (Pan Abode) Build Progress

2011-10-07 09:15

[previous]

 

[index]

 

[next]

Image 20 of 95
[reduced]
(70k)
    [original]
(660k)

The west-side gable-end is hoisted into place (by crane) and has been braced temporarily with two-by-fours. The east-side gable-end is still lying on the floor (right foreground) and the shadow of the crane hook is clearly visible. What looks like a jumble of two-by-fours in the middle of the floor is actually the pre-built stub of the load-bearing stud wall which will run across the centre of the upper floor.