Log House #2 (Pan Abode) Build Progress

2011-09-28 17:29

[previous]

 

[index]

 

[next]

Image 18 of 95
[reduced]
(59k)
    [original]
(708k)

Once the second floor is covered, we use it as a platform to build the gable-end trusses and the dormer framing.