Log House #2 (Pan Abode) Build Progress

2011-09-15 09:40

[previous]

 

[index]

 

[next]

Image 15 of 95
[reduced]
(81k)
    [original]
(592k)

The log walls are topped out, the hold-down bolts trimmed to length and tightened down and the stud-wall construction has started. Visible at the sides of this picture is the scaffolding, which currently towers over the log walls.