(2747k)

This shows the lounge/kitchen area mid-way through the ceiling installation. As you can see, the tongue-and-groove for the ceiling is stored inside to dry before fitting. Just above the handle for the terrace door, you can also see some of the newly-installed wiring sticking out of the wall where a switch plate will be installed later.