June/July 2008 / Finished Eaves Boards

2008-06-15 17:32

[previous]

 

[index]

 

[next]

Image 3 of 8
[reduced]
(23k)
  [large]
(82k)
  [original]
(2327k)

By the end of the day the East side eaves boards were done. The trim remains to be fitted. The ventilator panels are visible near the roof edge of the eaves in this photo.