Rafter Fest - Sunday the 9th of March 2008 / Preparing for the installation push

2008-03-09 09:52

[previous]

 

[index]

 

[next]

Image 1 of 6
[reduced]
(29k)
  [large]
(108k)
  [original]
(3167k)

This picture shows the slider mounts installed on the top log of the side wall, ready for the rafters. We installed about thirty of these, including countersinking the holes with a chisel, on the day previous to the rafter-fest. This was taken on Sunday morning, after the installation of the temporary flooring (also visible).