September (Autumn Equinox) holidays and laying the permanent floors / Detail of battens holding particle-board for insulation

2008-09-15 11:15

[previous]

 

[index]

 

[next]

Image 3 of 12
[reduced]
(19k)
    [original]
(318k)

Here you can see the battens and particle-board in the area where the bedroom wall meets the front entrance (which is about 50mm lower than the rest of the floor). The cables for the porch and hallway light switches come through the floor exactly where the wall will be installed.