September (Autumn Equinox) holidays and laying the permanent floors / Starting the framework (studding) for the internal walls

2008-09-22 15:41

[previous]

 

[index]

 

[next]

Image 9 of 12
[reduced]
(26k)
  [large]
(86k)
  [original]
(2743k)

Once we got started on the framing for the internal walls it all went very quickly, with the exception of the area around the roof peak where the centre beam, which protrudes down into the living space inside the house, made it a lot more complicated (and it's already complicated enough, because of the need for a settling space between the top of the walls and the bottom of the ceiling).